The Project

The new 118 No. bedroom hotel in the centre of York was constructed primarily in Cross Laminated Timber (CLT), stacked and slotted together to create bedrooms and bathrooms from second to fifth floor. Use of pre-fabricated room modules minimised the construction programme.

The bright and open lobby layout is paired with contemporary furniture. The ”Plug and Meet” gathering areas provide modern ergonomic seating, large writing walls and 56 inch televisions for presentation projection. The lobby also boasts a state-of-the art video wall and 24/7 food & beverage offering.

The Facts:

Client - Moxy Hotels
Main Contractor - Simpson (York) Ltd
Location - York
Contract period - Oct 2018 –May 2019

The Work

A F Connell Ltd undertook the design & co-ordination, installation, testing and commissioning of all the mechanical, electrical and plumbing services. We were fully integrated into the design team to provide a fully functional facility for Simpson Ltd.

The services installed include ventilation, domestic hot and cold water systems, chilled water, full electrical distribution systems including metering and associated switchgear, all lighting, lighting controls, combined heat & power unit, power, CCTV, door entry, data systems, fire alarm etc.